Liquefication
Construction of a VL100 helium liquefier, 20 L/h without LN2 pre-cooling, at the University of Leeds.

Neubau einer Heliumanlage
- Design, manufacturing, assembly, and installation of a new helium liquefier with gas-bearing expansion turbines.
- Delivery of a Helium Liquefication Plant
- Cycle compressor, watercooled
- Oil Remover System with Gas Management Panel
- Coldbox incl. expansion turbines and freeze-out-purifier
- Gas dryer
- Process control technology (MSR)
- Pure Gas Buffer 1x 4.000 l at 16 bar
- High-purity gas piping within the building
- Installation of all system components
- Commissioning of the entire system
- Maintenance of ongoing operations during conversion and construction phase, no significant losses
Realization date
01/2023Performance data
- Liquefication Rate:
- 20 l LHe/h without LN2 pre-cooling
- Compressor el. consumption: 55 kW
Contact
University of Leeds
Condensed Matter Physics
School of Physics & Astronomy
E.C. Stoner Laboratory
Leeds, LS2 9JT, UK